王東升-橋梁抗震與減震控制研究團隊

學術論文詳情

Rapid repair techniques for severely earthquake-damaged circular bridge piers with flexural failure mode

作者: Z Sun , H Li , K Bi , B Si , D Wang 日期 : 2017-07-08

摘要:In this study, three rapid repair techniques are proposed to retrofit circular bridge piers that are severely damaged by the flexural failure mode in major earthquakes. The quasi-static tests on three 1:2.5 scaled circular pier specimens are conducted to evaluate the efficiency of the proposed repair techniques. For the purpose of rapid repair, the repair procedure for all the specimens is conducted within four days, and the behavior of the repaired specimens is evaluated and compared with the original ones. A finite element model is developed to predict the cyclic behavior of the repaired specimens and the numerical results are compared with the test data. It is found that all the repaired specimens exhibit similar or larger lateral strength and deformation capacity than the original ones. The initial lateral stiffness of all the repaired specimens is lower than that of the original ones, while they show a higher lateral stiffness at the later stage of the test. No noticeable difference is observed for the energy dissipation capacity between the original and repaired pier specimens. It is suggested that the repair technique using the early-strength concrete jacket confined by carbon fiber reinforced polymer (CFRP) sheets can be an optimal method for the rapid repair of severely earthquake-damaged circular bridge piers with flexural failure mode.

©2022 王東升-橋梁抗震與減震控制研究團隊  京ICP備18023726號-1

技術支持: Geecho

日韩在线电影无码制服丝袜,亚洲欧美录音精品有声2区,亚洲乱码尤物193yw,手机在线不卡岛国免费AV,成年美女黄网站18禁动态图,欧美日韩一本到手机在线不卡,国产V综合V亚洲欧美大,美国大臿蕉香蕉大视频爽不停